Land and workshop
☆ Batch land,65-70 USDs/ m2. (50 years).
☆ expropriate land,220,000 ~ 250,000 Yuan per acre.
☆ Workshop for leases is for 0.40~0.50
Yuans/ day per
squares meter, ground lease for 0.15~0.20
Yuans/ day per square meter.
The
water & electricity fees
☆ charges 2 Yuan every ton water( include the dirty water rate of row)
☆
Electrovalence table in bottom hour in Shanghai (Yuan/KVA hour)
Classification |
Trades |
Below 400V |
1000V |
35thousandV |
Above110 thousand
V |
| Electrovalence |
Prime Time8:00~11:00
18:00~21:00 |
Industry |
0.956 |
0.944 |
0.929 |
0.914 |
Non-industrial
business |
0.984 |
0.972 |
0.957 |
0.942 |
Oridanary
Period6:00~8:00
11:00~18:00
21:00~22:00 |
Industry |
0.585 |
0.570 |
0.555 |
0.540 |
Non-industrial
business |
0.661 |
0.646 |
0.631 |
0.616 |
Valley
Time
22:00~6:00 of the next day |
Industry |
0.269 |
0.264 |
0.259 |
0.254 |
Non-industrial
business |
0.272 |
0.267 |
0.262 |
0.257 |
Basic Electrovalence
|
30¥/KW*month (Upon the maximum demand)
|
☆
The power factor adjusts and the electrovalence will charge according to present
regulation ☆ The capability of electricity equipment of customer is below
350 kilowatt or the maximum required quantity is below 150 kilowatts, you should
adopt low pressure three mutual and four line 380 voltage, power supplies is 720
Yuan/ KVA; 350 KVA above or the biggest demand is above 150 kilowatts you should
adopt high pressure power supply and power supply is 290 Yuan/ KVA. . Engineering
fee is charged additionally.
Usage
fee for land ☆ Industry, warehouse, transportation,
plant, farming, general business enterprise:1~25 Yuan/ m2 per year. ☆ The advanced
technique and production export business enterprise:0.5~7 Yuan/ m2 per year. ☆
Other: 2~45 m2 per year.
|